Infrastructure
After operating out of a rented building for more than one year, Parivaar could first purchase its own land in December ’04 and since then continuously infrastructure has been developed. Parivaar Ashram at present is spread over an area of 150,000 sq ft.
Infrastructure Work accomplished till now
- 7000 Sq. Ft Residential Block for children : This new Bal-Sadan Block is now providing accommodation to 100 children and has been built at a cost of Rs. 30 Lacs. It is divided into 8 halls (4 Study halls and 4 Bed-halls) and has 32 toilets / bathrooms within it.
-
Three Bal Sadans (each 1030 sq. ft. in area ) having a Living Hall, Study Hall, Caretaker’s room, store, bathrooms and toilets. Cost incurred 3.75 Lacs x 3 = Rs. 11.25 Lacs.
- Annapurna Bhavan ( 1825 sq. ft. in area ). It is composed of spacious dinning arena for more than 200 diners, Kitchen arena, and Kitchen & accessories store. Cost incurred = Rs. 7.5 Lacs.
- Prathana Bhavan [ 1650 sq. ft. in area ] Cost incurred = 6.5 Lacs.
- Sevak Sadan (Double-Storeyed): Single rooms for resident gent workers. Cost incurred = 8 Lacs.
- Guest Rooms (2 rooms with toilets - 750 sq. ft. in area]. Cost Rs 2.75 Lacs.
- Two–Storeyed Balika Sadan No. 1 : (2300 sq. ft in area ) Costs Rs 9 Lacs.
- Two-Storeyed Balika Sadan No. 2: (2300 sq. ft. in area) Costs Rs 9 Lacs.
- Construction for 3750 sq. ft Amar Bharat Vidyapeeth. Cost Rs 15 Lacs.
- Computer Lab & Library Block. The area of this Hall is 1800 sq. ft. and has been constructed at a cost of Rs 7.5 Lacs.
- Multi-Activity Hall. Its area is 1600 Sq. ft. and has been built with a cost of Rs 7 Lacs.
- A 6 Room Block serving as Sick-Bay, Medical Section and for Resident Sister-Workers of the Ashram. Costs Rs 4 Lacs.
- 30,000 Litre capacity Overhead Tank 3 Lacs.
- Administrative and Village Service Complex : Rs 8 Lacs.
-
Boundary Wall, Sanitary and Sewage Systems, and other miscellaneous development : Rs 15 Lacs.
Cost of Land Premises : Rs 35 Lacs.
Cost of Land Premises : Rs 35 Lacs.
Cost of Construction till date: Rs 143.5 Lacs.
Total Infrastructure development at Parivaar Ashram: Rs 178.5 Lacs.
|